Đại học Kinh tế Quốc dân – National Economics UniversityMICRO4ASIA
🏆 Arena
Sign inSign up
MICRO4ASIAThe six micro-credentials

Courses are delivered on the Limio learning platform. Limio

← Prompt Engineering

You are viewing a public preview

Sign in to save your progress, do assignments, join discussions and get feedback.

Sign in
Module 3 — Execute: Apply, Compare and Automate

Period 9 · Reuse and Automate Workflows

Print / Save as PDF
Lecture video — Period 9: Reuse and Automate Workflows

What can be reused when the input changes, and the difference between a template, a workflow, a skill and an automation.

Flashcards · Period 9

10 words
WordMeaningExample
  • Template

    Reusable instructions with replaceable inputs. The stable parts stay fixed; the file, period and audience change each run.

    Prepare a briefing using [FILE] for [PERIOD] for [AUDIENCE].

  • Workflow

    Ordered stages with their inputs, outputs and review gates: receive, inspect, calculate, visualise, draft, approve.

  • Skill

    Platform-dependent packaging of instructions and resources (template, metric definitions, checks). Not available in every tool; saved prompts are a valid fallback.

  • Automation

    A run started by a schedule or trigger. It can use only the inputs, permissions and tools that actually exist.

  • Review gate

    A point where a person validates or approves an output before work continues or anything is distributed.

  • Reporting period

    The time span a file covers. It must come from trusted metadata, not from a filename or a guess.

    The teaching CSV has no dates, so it cannot be "January".

  • Exception report

    What the workflow produces when a check fails: a clear description of the problem, not a polished briefing.

  • Fresh data, fresh checks

    Every run recalculates from the new input and repeats the checks. An old answer with a new title is not a report.

  • Reproducible weekly summary

    A versioned template, the input file version and a log of checks together, so another person can repeat the run.

  • Keep it manual

    Stay manual until input ownership, destination permissions, retention rules and review responsibility are confirmed.